fbpx Use of construction hall | The Oslo School of Architecture and Design

Languages

Use of construction hall

The construction hall shall primarily be used for teaching/research-related activities. The head of the workshop department decides how to prioritise use of the construction hall. The hall is 285 square metres, and the height to the ceiling is 10.6 meters. The lighting is good. The construction hall has room for full-scale construction, big structures and model building.

Do you want to use the construction hall?

Rules for use

  • Opening hours are from 8.00 to 17.00.
  • Access by car through the outside gate, to be agreed with the workshop attendant.
  • Use of the crane must be agreed with the workshop attendant.
  • Security must be a priority at all times
  • The premises must be kept in good order, also while being used.
  • After use, waste must be removed, and the tools and equipment placed in their correct place.
  • Finished products and remaining materials must be removed.
  • After use, the workshop attendant will check the hall.
  • AHO’s general house rules also apply.